Purchase Orders Accepted Schools and settings welcome Easy 30-day returns
Sensory Room Case Studies

Westlands First School

This was a tight space but wanted lots of interactivity. The result was some of our best panels with in this space.

Westlands First School

At a glance

Setting

School

Room Size

2m by 5m

Completed

October 2025

Key Equipment

Rod Wall, Gravity Wonder Wall, Sound Light Panel and a Tactile Panel

Case Study Photo Carousel — Preview

What the space needed

We designed and installed a bespoke sensory room for Westlands First School. There was limited space but the team wanted as many interactive items as we could fit, I think that we delivered.

Features and equipment

The finished room brings together eight pieces of sensory equipment, each doing a different job:

  1. Bubble column - bright, controllable colours with adjustable air flow: full power for a stimulating effect, turned down for something calmer, plus a choice of pulse settings.
  2. Gravity Wonder Wall - A beautifully made wooden tactile panel with a number of ways to play.
  3. Fibre Optic Tails - cascading fibre optics from the ceiling, ideal for sitting underneath and handling.
  4. Sound Light Panel - create different reactions in light with noise, from clapping to singing the panel reacts.
  5. Pixels panel - an interactive light panel with three modes for creating your own patterns.
  6. Infinity mirror - an interactive fibre optic tunnel that reacts to voice, clapping and other sounds, creating the illusion of infinite depth; it comes with a handheld microphone or can run hands-free from ambient sound in the room.
  7. Rod wall - coloured rods that slot into place to build patterns, encouraging hand-eye coordination and creativity.
  8. Tactile Panel - A simple pleasant surface to touch, with different shapes and textures to explore.

The work we did

After an initial visit, we put together a design based on the space and the equipment the team wanted to see, refining it over a few iterations before settling on the final layout.

The installation was done over a couple days, with no need for a later return visit as there wasn't any padding.